Materials for complete EXTERIOR (without windows)
The delivery includes construction material according to the production documentation for the complete realization of the exterior
- project Package Exclusive
- construction wood for the frame of a wooden building (perimeter walls, internal partitions)
- construction wood for the truss and roof
- material for exterior wall cladding (OSB board)
- material for* facade insulation* (including connecting accessories)
- accessories for roofing
- roofing including gutter system
- construction lumber for external grates (for a ventilated wooden facade) and facade foil
- wooden facade (siberian larch)
- complete fasteners and accessories for exterior assembly
Delivery time 8 – 10 weeks

Materials for complete EXTERIOR (without windows, with the production of frame wooden construction)
The delivery includes construction material according to the production documentation for the complete realization of the exterior
- project Package Exclusive
- finished frame constructions of perimeter walls (externally sheathed with OSB board)
- finished frame constructions of internal walls (without cladding)
- construction wood for the truss and roof
- material for facade insulation (including connecting accessories)
- accessories for roofing
- roofing including gutter system
- construction lumber for external grates (for a ventilated wooden facade) and facade foil
- wooden facade (siberian larch)
- complete fasteners and accessories for exterior assembly
Delivery time 10 – 12 weeks

Windows and window system
We can supply the window system together with the material for the exterior according to the exact production dimensions.
The prices of the window system are different and depend on the type of window profiles.
Delivery of windows is possible in plastic version (5-chamber pleated with 2 glass or 3 glass), or in wooden and aluminum version.
The standard delivery (according to our projects) includes a plastic window system with insulating 3 glass and double-sided Anthracite color.
We calculate the prices of the window system individually.

Materials for complete INTERIOR
The delivery includes construction material according to the production documentation for the complete realization of the interior
- internal insulation of the frame structure (perimeter walls, internal partitions, roof)
- vapor tight foil
- interior cladding (spruce)
- floor insulation (floor polystyrene)
- floor heating (heating film)
- material for electrical installation
- materials for plumbing
- material for the creation of an installation wooden grate (for floor and walls)
- OSB boards for floor covering
Delivery time 8 – 10 weeks